Excavation Calculator

Find how many cubic yards you're digging, how much it swells once dug, and how many truckloads it takes to haul away.

Shape
Soil Type (Swell)
How much the soil grows once dug.
Loose yards per load.
$
Hauling price per truckload.
Fractions and decimals both work.
Bank Cubic Yards
Cubic feet
Loose volume
Truckloads
Metric
Hauling Cost

Dig List

Items you add are saved in this browser.

NameSizeBank Yd³Loose Yd³LoadsCostRemove

How to Calculate Excavation Volume

Dirt is measured three ways. Bank cubic yards are the soil as it sits in the ground. Once dug, it loosens and takes up more room: loose cubic yards, which is what fills trucks. Compacted in a fill, it takes up less. The swell percentage converts bank to loose.

Bank cubic yards = length × width × depth (ft) ÷ 27
Loose cubic yards = bank × (1 + swell)   Truckloads = loose ÷ truck capacity

Worked Example

Swell by Soil Type

MaterialSwellLoose Yards per 10 Bank Yards

Typical values published by ProjectEngineer.net; actual swell depends on moisture and how the material breaks.

Tips

Call 811 before digging. Trenches deeper than 5 feet need protective systems under OSHA rules, such as sloping, shoring or a trench box. Dump truck capacity is usually limited by weight before volume with wet or rocky soil, so check both. Plan where spoil will go: a pile next to the excavation must be set back from the edge.